Description of METEKO electrical arc furnance:
- Modern technologies of steel melting, with wide range of branded products;
- Furnaces with a capacity of 5 to 200 tons, as well as advanced unit capacty, with a duration of melting 30-35 minutes;
- Application of direct current furnaces that reduce energy consumption, refractories and electrodes, to avoid expensive filter-compensating devices, etc.;
- Deep high voltage input 110 kV directly on furnace transformer instead of the traditional 35 kV;
- Technology of preliminary scrap preheating with process gases;
- Use of modern furnace cooling systems;
- Special modes of pre-heating ladle lining before receipt of melted metal to 1100-1200 C, that decreses refractory consumptions;
- Secondary steel treatment technology and vacuum treatment (reducing specific power consumption on 3-5 kWh per ton of steel)
- Creation of new and modernization of existing gas cleaning systems