Modernisation of existing, or participation in a construction of new thermal power plants (TPPs)
-include all major individual sets such as fuel storage and manipulation with all related auxiliary systems (particularly for coal TPPs), boiler reconstruction and subsystems (such as fans, pumps, demineralization water supply plant, desulphurisation, electrostatic filters, bag filters etc.), turbo-generating set, turbine regulator, generator excitation and synchronisation system, power transformer, switchyard, uninterruptable power supply, low-voltage distribution (MCC), measurements, interlocking, protections, control and SCADA systems, waste water processing.